I. The necessity of construction The Guiyang wharf is situated in the north shore middle reaches of Xiang River with 134 thousand meters far from waterway of Hengyang city. With good channel condition, barges in the thousand-ton level are accessible to seas, but with weak infrastructure equipment of ports, it is rather difficult to handle cargo shipping, which has become the bottleneck of water transport development in Qidong, Changning, Qiyang, and seriously check the economic development of these three counties. With further development of the policy of reform and opening-up,the economy of county boomed, the flow maritime cargo rise year by year, it was popularized among shippers, coupled with affordable cost, long distance as well as capability of lifting.
II. The constructional fundament Feasible research reporter and planning design finished. III. The major constructional content of size With totally 6 berths, including 2 berths at the 500-ton level, 4 berths at the 1000-ton level. The annual handling capacity of 6 million ton. IV. The investment in construction The total investment of 0.33 billion yuan, totally from investment attraction. V. The ways of project investment and the return mode on investment After putting into operation, we predict annual output of 80 million yuan, annual profitability of 16 million yuan, as well as tax payment of 3.2 million yuan. VI. Project product market and the benefit analysis of economic society Individual proprietorship, joint investment VII. The project unit and contact Project unit: management committee of economic development zone of Qidong. Contact: He sixi Number: 13907476288
Sponsored by Hengyang Municipal People's Government, Undertaken by Hengyang Normal University
Co-sponsored by Information Office of Hengyang Municipal People's Government Technical Support & Design:Hengyang Normal University
ICP NO:05002289