-- Article list --

The Hunan Expressway Hengyang Logistics Hub project was launched on February 8, 2022. It is China's first expressway logistics hub which combines expressway service areas and logistics parks. It will help optimize the modern logistics system, improve logistics chains, expand industrial chains, stabilize supply chains, and provide logistics support to Hengyang's high-quality economic and social development. 

The hub is located in Huangshawan Neighborhood, Shigu District, Hengyang. It stands by Hengyang-Shaoyang Expressway in the north, and the North 3rd Ring Road in the south; and stretches to Zhengxiang North Road in the east, and Cailun Avenue and Shigu District Expressway Toll Station in the west. The total area is about 401 mu (26.73 ha.), with a total investment of 880 million yuan. The construction will complete within three years.


Based on Hunan's expressway network, the project integrates expressway service areas and logistics parks to develop three major functional zones – expressway logistics service zone, smart urban logistics zone, and supporting service zone. It will build a comprehensive logistics park with expressway service area, intercity logistics service, express delivery concentrated transportation and distribution, and supply chain and information service. It will become a core hub of Hunan’s expressway logistics park network.


This project is expected to become a carrier of the modern logistics service system in south Hunan, and an exploration platform for the integration of expressway service areas and logistics parks, according to Zhang Longxing, president of the Hunan Expressway Construction and Development Co., Ltd.


This article is from Hunan Provincial Government www.enghunan.gov.cn.


Hunan Expressway Hengyang Logistics Hub Project Launched

Recently the Hunan Provincial Department of Industry and Information Technology released 40 key projects in electronic information manufacturing industry in 2022. It aimed to build a national electronic information industrial cluster. Upon operation, the projects will generate an extra income of more than 100 billion yuan. 


The 40 projects have a total investment of 135.2 billion yuan, with a planned investment of 27 billion yuan in 2022. There are 4 projects each with an investment of 10 billion yuan, five projects each with an investment of 5 to 10 billion yuan, and 12 projects each with an investment of 1 to 5 billion yuan. The projects cover such fields as integrated circuit, power semiconductor, intelligent terminal, basic components, and electronic material.


The projects highlight the driving role of leading ones in upstream-downstream synergy. San'an Semiconductor Project and Huashi Semiconductor Project will facilitate the establishment of a third generation semiconductor industrial chain involving from upstream of wafer material and associated equipment to downstream of chip and devices. Changsha Intelligent Valley Project and Sinnet Project will achieve interconnected development to further promote Hunan’s infrastructure level in computing and facilitate the building of a world-class algorithm innovation center.


The projects focus on shoring up weaknesses and improving structure to promote high-end development. Hunan Shaohong Special Glass Project and Zhuzhou Torch Antai ITO Target Project highlight key basic materials to ensure the safety of the industrial chain and supply chain. Lens Technology Intelligent Terminal Equipment Project, Tenda Global Intelligent Manufacturing Base, and Kingcome Group Intelligent Terminal Industrial Park will make up for the shortcomings of the province’s electronic complete machine products and boost Hunan’s electronic information industry to a higher level.


Hunan Province will increase support for provincial key projects and enterprises in electronic information manufacturing industry to apply for special funds, to provide guarantee for land use, energy supply, employment, financing, and personnel.


This article is from Hunan Provincial Government www.enghunan.gov.cn.


Hunan Province Rolls out 40 Electronic Information Manufacturing Projects in 2022

Recently the General Office of the Hunan Provincial People's Government has released an implementation plan for vigorously promoting industrial development. It is a practical measure to adhere to strategic positioning and fulfill tasks and missions of "Three Hubs and Four New Missions" Strategy. By 2025, six trillion-yuan industries and eight 100-billion-yuan enterprises will be fostered, and about 80 10-billion-yuan projects will be launched. This will continue to enhance the overall strength and core competitiveness of industrial development.


The 12th CPC Hunan Provincial Congress called for efforts to develop a group of world-class industrial clusters and a number of leading and globally competitive enterprises. Currently Hunan has three trillion-yuan industries and 14 100-billion-yuan sectors. There are four 100-billion-yuan enterprises and 38 10-billion-yuan companies in the field of manufacturing industry. 


The development potential of trillion-yuan industries and 100-billion-yuan enterprises is mainly contributed by the fields of farming, forestry, animal husbandry and fishery; industry and information technology; construction; and services. During the 14th Five-year Plan period, four trillion-yuan industries and five 100-billion-yuan enterprises will be developed in manufacturing industry; 55 10-billion-yuan projects will be launched in the sector. One trillion-yuan industry will be fostered in construction industry and 20 10-billion-yuan projects will be implemented in service sector.


A gradient cultivation mode will be adopted to develop industries, enterprises, and projects, and improve environment at provincial, city and county level. Focusing on leading industries, competitive industries, and industries of the future, Hunan Province will foster a group of trillion-yuan industries, 100-billion-yuan enterprises, and 10-billion-yuan projects at provincial level; a group of 100-billion-yuan industries, 10-billion-yuan enterprises, and 1-billion-yuan projects at city level; a group of 10-billion-yuan industries, 1-billion-yuan enterprises, and 100-millon-yuan projects at county level.


Industry cultivation highlights supporting industries through upgrading foundational industrial infrastructure, developing industries through strengthening coordination, gathering industries through building “Five-good” industrial parks, and cultivating industries through integrated development.


Enterprises will be cultivated through upgrading, introducing, expanding, and merging and reorganization.


Projects will be promoted through transformation and upgrading; investment attraction; innovative achievements commercialization; outstanding enterprises incubation; and existing resources.


These efforts will help ensure the great industrial development.


This article is from Hunan Provincial Government www.enghunan.gov.cn.


Hunan to Vigorously Promote Industrial Development


1.Construction Necessity
   Leiyang is home to 1.45 million people. With aging population intensified, demands for the aged in urban and rural areas have increased. It becomes more pronounced when rural prime labors go out to work and don’t have enough time to take care of elders. Inspired by great market outlook, construction of senior citizen apartment offers good social and economic benefit.
2.Construction Fundament
  Preliminary work, such as land acquisition and project approval, is completed.
3. Major contents and scale
   300 mu of land is to be used for constructing senior citizen apartment,  offices and living subsidiary rooms to accommodate 2000 elders.
4.Construction Investment
  The total investment is 200 million dollars.
  Funding from the project comes from enterprise itself. 
5. Approaches of cooperation and return 
   The project will be completed by cooperation and joint venture. The enterprise will make profit through its own management decisions and applying for nation funding support.
6. Project units and contact information
    Contact Department: Leiyang Development and Investment Administration
    Contact: Chunhe Jiang
    Contact Number: 13974797117
 

Senior Citizen Apartment in Leiyang


1.Construction Necessity
    Boasting the profound culture of longevity and happiness, Nanyue Heng Mountain is endowed with natural conditions which favor health care and fitness. It can be reputed as a natural oxygen bar with 80% forest coverage, more than 1400 plant species and negative oxygen ions 26000 per cubic centimeter. The life expectancy of the district is 76 years old now, 1.2 years higher than that of the whole nation. Establishing “ centenarian health zone”, building apartments for the aged and developing aged service industry is put forward by Nanyue district commission and government. These actions have great significance to carrying forward the culture of longevity and happiness of Nanyue Heng Mountain.
2. Construction Fundament
   The planning design and approval is completed.
3.Major contents and scale
    The total plot area is 1000 mu. This comprehensive retirement center and  living experience area sets entertainment, accommodation and catering all in one.
4.Construction Investment
  The total investment is 500 million RMB.
5.The analysis of market outlook, social and economic benefits
   It is anticipated that 80 million RMB and 45 million RMB for annual revenue and return respectively can be realized.
6.Modes of investment attraction and return
  Sole proprietorship or joint venture
7.Project units and contact information
  Contact Departments: Nanyue Bureau of Administration
  Contact: Xianping Deng
  Contact Numbers: 0734-5679231,13908445919

 

Fushou International Retirement Center of Nanyue


  1. Construction Necessity
    Nanyue Heng Mountain and its surrounded areas have a subtropical humid   monsoon climate featuring enough heat, maximum daylight, abundant rainfall and  four distinct seasons. The annual average temperature is 18 degrees, annual precipitation 1400 mm and the annual average frost-free period 300 days. Boasting the profound culture of longevity and happiness, Nanyue Heng Mountain is endowed with natural conditions which favor health care and fitness. It can be reputed as a natural oxygen bar with 80% forest coverage, more than 1400 plant species and negative oxygen ions 26000 per cubic centimeter. With convenient transportation, it is the best place to establish high-end retirement real estate close to core scenic spots of Nanyue Heng Mountain.
     Now we have 156 million people of 60 or above, accounting for 12% of national population. It is predicted by experts that the ratio of elderly population will reach up to 25% in 2030. With rapid economic development and aging population, traditional pattern of old-age support can not take responsibilities of present society. Thus it is in urgent need for developing aged service industry to ease our aged support pressure.
2.Construction Fundament
    Project planning and site selection are completed.
3.Major contents and scale
    The construction site is in Longquan Village, Kaiyun town, Hengshan county. It covers area of 200 mu ( equity and tenancy combined). The multifunctional retirement apartments integrating residence, recuperation, medical treatment, health care, entertainment, working and study are to be built. Meanwhile, it carries out home-based old-age support, hotel-based services and medicalized management. Other supporting projects like green food planting, breeding base construction and hotel opening will be implemented at the same time.
4.Construction Investment
   The total investment is 1000 million RMB.
5.The analysis of social and economic benefits
  Rental Income: 46 million RMB (20 square meters per elder, occupancy rate 80%, accommodation of 5200 people all year round, 750 RMB a month per person)
Operating Revenue: 24 million RMB earned from hotel, cultivation, entertainment, health care, medical treatment and recuperation.
6.Approaches of cooperation and return
  Joint venture, cooperation and investment
7.Project units and contact information
  Contact Department: Bureau of Commerce of Hengshan County
  Contact: Bin Tan
  Contact Numbers: 0734-5812758

 

Multifuctional International Retirement Holiday Village of Nanyue

   With economic development and improvement of people’s living standards, our national population goes toward the trend of aging. Hengyang also has the similar situation and sever old-age support problems. The project construction answers the requirement of building a harmonious socialist society. Given the growing of “ Four-Two-One” families, supporting elders has become a social issue. We can provide integrated services of daily care, diseases treatment and professional care after the project is completed. In this course, old-age support and joy can be realized so as to promote harmony of family and society.
1.Construction Fundament
  The planning is completed.
2.Major contents and scale
   The project construction is divided into two phases. Hospital outpatient building, inpatient building (200 beds), the first-phase convalescent home (300 beds), the first unit of old-aged apartment (1000 beds) are to be built in the first-phase project. The planned area covers 200 mu and the construction cycle is 3 years. The second, third and fourth unit of old-aged apartment (4000 beds), the second-phase convalescent home (700 beds) , family hotel, old-aged leisure park and community infrastructure are to be built in the second-phase project. The planned area covers 300 mu.  
4. Construction Investment
  The total investment is 600 million RMB, phased implementation.
  Funding is mainly self-raised by the proprietor.
5.The analysis of social and economic benefits
   The project is capable of providing old-aged services for 5000 elders, medical treatment and rehabilitation services for 10,000 people a year. It is expected that 500 million RMB on annual revenue and 50 million RMB on annual profit can be achieved.
6.Approaches of cooperation and return
  Sole proprietorship, joint venture and cooperation
7.Project units and contact information
  Contact Department: Construction Affairs Bureau of Hengyang Old-aged Rehabilitation Hospital and Endowment Community
  Contact: Tiesheng Zhu
  Contact Number: 13907470708

 

Hengyang Old-age Rehabilitation Hospital and Endowment Community


 1. Construction Necessity
    The lack of high profile and high standard public sports venues and inability to host major culture and sports competitions curb the development of Changning
 sports competition market and improvement of competitive level. At the same time,  it goes far from meeting people’s increasing demand. Constructing sports competition center is an inevitable trend for the development of Changning sports career.
 2. Construction Fundament
 It is included in Changning 13th Five Year Plan.
 3. Major contents and scale
 300 mu of land is expropriated.
 Stadium, gymnasium, aquatics center, training stadium, integrated teaching building, shooting hall, sports service center, athletes apartment and central square
 4. Construction Investment
 The total investment is 150 million RMB. Project fund is introduced by attracting Investment.
 5. The analysis of social and economic benefits
   The annual membership income will reach 1 million RMB after sports center be completed, ticket proceeds of hosting major cultural and sports competition  exceed 5 million RMB , tenancy fee more than 2 million RMB, books income more than 1 million RMB, advertising revenue and sponsorship fee 2 million RMB. It is expected that total investment can be recouped in 20 years.
 6. Approaches of cooperation and return
 Cooperation, joint venture and sole proprietor The investor can be granted with the relevant preferential polices of Changning investment attraction.
 7. Project units and contact information
 Contact Department: Changning Sports Bureau
 Contact: Qingzhong Yin
 Contact Number: 13974778566

 

Changning Sports Competition Center


   1. Construction Necessity
    Urban area in Changning has expanded by five-fold compared with that before reform and opening-up. The new district has become political and cultural center. Since hospitals are centralized in the old district and the new district stands no large-scale hospital, the lack of medical facilities directly affects citizens’ medical-seekingconditions. To improve unbalanced distribution of urban hospitals, medical level and provide people health care, extension of Changning People’s Hospital is vital.
   2. Construction Fundament 
    The construction site is located at south second ring with convenient transportation and wide coverage, which is conducive to patients seeking medical treatment.
   3. Major contents and scale
     With area of 288.8 mu of land and overall floorage of 0.1 million square meters, it functions as a comprehensive hospital integrating medical treatment,research, teaching, health care, rehabilitation and old-age support. Having 900 beds, it is constructed based on the.standard of national third-class hospital.
   4. Construction Investment
   The total investment is 300 million RMB.
   Project fund is introduced by attracting  investment.
   5. The analysis of social and economic benefits
    The scope of services can cover Changning and its surrounded counties and  cities after the project is completed. Based on the increasing hospital annual income from 5% to 8%, the investment can be recouped in 10 years (construction period not included)
   6. Approaches of cooperation and return
   The final specific way is determined by contracting after discussion.
   The investor can be granted with the relevant preferential polices of Changning  investment attraction.
   7. Project units and contact information 
   Contact Unit: Changning People’s Hospital
   Contact: Zhijian Liu
   Contact Number: 13975411992


 

Extension Project of Changning People’s Hospital


   1. Construction Necessity
    Hengyang First High School is the former railway school and hardware   construction lags far behind other schools. It has to give place to burgeoning urban construction. Matched with the need of excellent school of developing Wuguang New District and Binjiang New District, relocation and construction of the first high school is the ideal solution.
   2. Construction Fundament
   The site selection and project approval are completed.
   The environment assessment, planning and design is undergoing.
   3. Major contents and scale
   220.4 mu of land is to be used in the first phase. The gross building area covers 59500 square meters.
   4. Construction Investment
   Expected total investment is 300 million RMB, including construction and  installation cost of 230 million RMB and other cost of 70 million RMB.
   5. The analysis of social and economic benefits
   The implementation of the project can enhance the current situation like narrow space, deficiency of hardware, teaching facilities and experiment conditions.It is beneficial for promoting stable, sustainable, coordinated and health development of Hengyang compulsory education.
   6. Approaches of cooperation and return
   Cooperation way: BT
   Return: cash
   7. Project units and contact information
   Contact Department: Hengyang City Construction Investment Co. Ltd.
   Contact: Jinyun Jiang
   Contact Number: 073-48862981

 

The First-phase Project of The First High School


1.Construction Necessity
   Jointly established by the government and corporations, Hengshan Mountain Science City is a new market-oriented, modern, ecological intelligence science city. The concentration of enterprise headquarters, research and trade centers, talents management and technology innovation teams will be achieved here. International School is initiated to satisfy education needs of kids of those elites working here and advance implementation of constructing international community in Hengshan Mountain Science City.
2. Constructional Fundament
  Project site selection is completed.
3.Main Contents and Scale
   A high-end international school, 300 mu of land, 8000 anticipated students will be taught by experienced teaching management group and foreign teachers.
4. Construction Investment
  The total investment is 0.6 billion dollars.
5. The analysis of social and economic benefit
  After completion, it is estimated that it can generate annual revenue of 120 million RMB and annual profit 50 million RMB. 
6. Approaches of cooperation and return on investment
   Sole proprietorship, joint venture and cooperation
7. Project units and contact information
  Contact Departments: Commercial Bureau of Hengyang
  Contacts: Yangning Peng, Kang Luo
  Contact Number: 0734-8153333


Fax Number: 0734-8217256

International School in Hengshan Mountain Science City


I. The necessity of construction
  Wind power features the function of being renewable, pollution-free,power-sufficient, which is regarded as the orientation of  resources strategic development of developed countries.Till the end of 2012, the number of cumulative wind installations has reached 80GM. With development of maturity of wind power technology and level of equipment manufacturing,the wind power industry will get long-term development in the future with the decreasing costs.

II. The constructional fundament
  The project has been included in the wind-powered electricity development plan of Hunan Province.
III. The major constructional content and size
  The overall land for the project is 3.9 square kilometer, and the valid mountain ridge for the wind power is 5 kilometers with a height above the sea level between 800 meter and 1100 meter. The mountain ridge in the project land going from south to north will be installed a electricity generation machine with total scale of 40MW and a new electricity positive booster with 110KV and a round channel with 110 KV will be switched-in through trolly wire.
IV. The investment in construction
  0.45 billion yuan of The estimate total project investment. Major construction fee includes  equipment purchase and installation fee, project construction cost as well as budget reserve etc.. The resources of capital funded by investors itself.

V. The benefit analysis of economic society
  The country and province will offer support to new energy project. After finished, the estimated annual sales revenue will hit 500million yuan through electricity access in about 80 million with benchmarking of wind power feed- in tariffs of 0.61 yuan per degree, which will help to save 25000 tons of standard coal, and push a remarkable project economics and environmental protection.
VI.The ways of cooperation and the return mode of investment
  By cooperation, joint investment,individual proprietorship. To negotiate contracts after identifying specific ways.
The investors can enjoy the relative preferential policies supported by investment attraction of Changning city, with the right to specific policy of “one discussion for one case”
VII. The project unit and contact
  Contact unit: Department of economic development of Changning city.
  Contact: Lei ronghua
  Number : 0734-7221083


 

Miquan Wind-powered Electricity Plant in Changning


I.the necessity of construction
  Wind power features the function of being renewable, pollution-free,power-sufficient, which is regarded as the orientation of  resources strategic development of developed countries. Till the end of 2012, the number of cumulative wind installations has reached 80GM. With development of maturity of wind power technology and level of equipment manufacturing,the wind power industry will get long-term development in the future with the decreasing costs.
II. The constructional fundament
  Wind collection and address survey finished.
III. The major constructional content and size
  The project covers about 71.8 square kilometers, with effective length of the ridge of 15km, altitude above the sea level of between 800m to 1100m. trend of inner ridge runs north and south, with the total installed capacity of 49.9 MV. What’s more, newly-built voltage booster of 110KV and a loop 110KV overhead line system also included.
IV. The investment in construction
  0.5 billion yuan of The estimate total project investment. Major construction fee includes  equipment purchase and installation fee, project construction cost as well as budget reserve etc.. The resources of capital funded by investors itself.
V. The benefit analysis of economic society
  The country and province will offer support to new energy project. After finished, the estimated annual sales revenue will hit 100 million yuan through electricity access in about 0.1 billion with benchmarking of wind power feed- in tariffs of 0.61 yuan per degree, which will help to save 30000 tons of standard coal, and push a remarkable project economics and environmental protection.
VI.The ways of cooperation and the return mode of investment
  By cooperation, joint investment,individual proprietorship. To negotiate contracts after identifying specific ways.
The investors can enjoy the relative preferential policies supported by investment attraction of Changning city, with the right to specific policy of “one discussion for one case”.
VII. The project unit and contact
  Contact unit: Department of economic development of Changning city.
  Contact: Lei ronghua
  Number : 0734-7221083

 

Miaoqian Wind-powered Electricity Plant in Changning

I. The necessity of construction
  Hengdong county is located in the northeast of Hengyang city. southwest metropolitan in Yunji and Dapu on the west, urban groups of Changsha, Zhuzhou, Xiangtan on the north, economic zone of Guangzhou, Hongkong, Macao with unique location advantage and convenient transportation condition. Industrial park lies in the Dapu town in Hengdong, more specific, in the midst of downtown and county town of Hengdong. It is obvious that 20km far from the downtown of Hengyang, and 22km to the county town of Hengdong feature the transportation advantage.
  Meanwhile, 315 provincial highway,Jingguang railway, Jingzhu expressway,Hengyan Expressway,Xiang River cross through the town.the industrial base of Dapu is relatively better, especially the fields of metallurgy, chemical industry,machinery. The strength of attracting investment is intensifying around these years,and co-enterprises are gradually growing, and momentum of growth is rather flourishing. 
II. The constructional fundament
  Planning finished.
III. The major constructional content and size
  The project covers an area of 90 acres designated to a capacity of boasting 0.6 million chemicals, metallurgical raw material berth, 0.3 million tons of agricultural products, groceries, wharf at a thousand-ton level with electromechanical equipment berth, support offices, warehouse,drainage system, greening, 1.3km off- road, culverts, plant roads affiliated.   
IV. The investment in construction
  Planned investment of 0.21 billion yuan, investment attraction tackles the issue of construction fund with a certain subsidy from country’s counties and provinces.
V. The benefit analysis of the economic society
  About 4km from Hengdong industrial park, including not only Hengdong industrial park, Dapu town, even the area of Hengyang, but also the perfect convergence from the inner transportation condition to the outer logistic equipment. The wharf can eliminate the enterprises’ transportation pressure of industrial park, decrease the transportation cost, improve the market competition, be beneficial to the investment attraction so that facilitate rapid growth of regional economic development. 
VI. The ways of cooperation and the return mode of investment
  By cooperation, individual proprietorship, joint investment, return of investment gained from operating margins.
VII. The project unit and contact
  Project unit: Department of Transportation of Hengdong county
  Contact: Luoyi
  Number:18673411199

 

Dapu wharf at thousand-ton level of Hengdong

 

I. The necessity of construction
  The Guiyang wharf is situated in the north shore middle reaches of Xiang River with 134 thousand meters far from waterway of Hengyang city. With good channel condition, barges in the thousand-ton level are accessible to seas, but with weak infrastructure equipment of ports, it is rather difficult to handle cargo shipping, which has become the bottleneck of water transport development in Qidong, Changning, Qiyang, and seriously check the economic development of these three counties. With further development of the policy of reform and opening-up,the economy of county boomed, the flow maritime cargo rise year by year, it was popularized among shippers, coupled with affordable cost, long distance as well as capability of lifting.
 
II. The constructional fundament
  Feasible research reporter and planning design finished.
III. The major constructional content of size
  With totally 6 berths, including 2 berths at the 500-ton level, 4 berths at the 1000-ton level. The annual handling capacity of 6 million ton.
IV. The investment in construction
  The total investment of 0.33 billion yuan, totally from investment attraction.
V. The ways of project investment and the return mode on investment
  After putting into operation, we predict annual output of 80 million yuan, annual profitability of 16 million yuan, as well as tax payment of 3.2 million yuan. 
VI. Project product market and the benefit analysis of economic society
  Individual proprietorship, joint investment
VII. The project unit and contact
  Project unit: management committee of economic development zone of Qidong.
  Contact: He sixi
  Number: 13907476288

 

Guiyang wharf with thousand-ton level of Qidong county